The Millennium Bridge, London UK

Slightly expansive, high performance grouts feature non-metallic chemistry so avoiding potential dimension instability, corrosion and staining in the future.

Thurrock Viaduct, Essex UK

Weber duct grout was used on this 1.2 km viaduct where post-tensioned ducts were grouted in lengths of 90 metres. In some areas along the viaduct the grout lengths increased to 135 metres.

The French Embassy, London UK

An existing five-storey building housing the French consulate required protection with a system able to cope with movement within the building fabric. The ideal solution was a highly elastomeric coating to protect and enhance the appearance of the building facade.

 

News

 
Avoid Common Concrete Repair Errors
Ronen Tal
Friday, June 3, 2011
 

Engineers and specifiers can improve performance of concrete patch repairs and reduce risk of failure. Learn to evaluate problems, correct and choose the right materials and techniques in this Teknika seminar for concrete restoration professionals, including contractors, engineers and specifiers. Call Teknika Services today to book a presentation of this workshop for your group.

The workshop will use examples from the Greater Toronto Area, such as the Don River Bridge and Highway 409, and will be presented by Managing Director Hakan Ekim, B.Sc, Dip., ICorr. Ekim is an engineering physicist and concrete corrosion specialist, with more than twenty years of experience in concrete construction and repair.